A workshop on the proposed Overpass Road project has been announced for November 29, 2012 from 5:30 to 8:00 PM at the Victorious Life Church, 6224 Old Pasco Road, Wesley Chapel.
Overpass Road is currently a two-lane facility that extends from Old Pasco Road to 0.86 miles east of Boyette Road. Pasco County proposes to widen this portion from two lanes to a minimum of four lanes. From Boyette Road to US 301, the roadway will be on new alignment and is proposed to be constructed as a minimum four-lane facility.
This proposed roadway capacity improvement project in Pasco County involves the addition of an interchange at the current flyover of Overpass Road and I-75; the extension of Overpass Road on new alignment from its current terminus located approximately 0.86 miles east of Boyette Road to US 301; and the widening of the existing segment of Overpass Road (from Old Pasco Road to east of Boyette Road). It is anticipated that Overpass Road and the proposed extension will be constructed at a minimum as a four-lane divided facility, with the potential to expand the roadway to a six-lane divided facility, if needed. The total project length is approximately 9.0 miles; the study corridor is shown on the project location map.
Project website link
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment